Preparing for Frame Assembly, step 4: Y Pulley Subassembly, Step 3

Finalize the subassembly by putting two M5-8 bolts with washers and extrusion nuts to the mounting holes. Do not tighten:

y bearing step3

  1. M5-8 x 2
  2. M5 washer x 2
  3. M5 extrusion nut x 2

Previous Next

Back